SoundSignal

Tacoma, in the Pierce County edition. Weekly, sent Thursdays.

What’s being built in Tacoma

The Tacoma items from this week’s Pierce County issue: what people have applied to build, and when you can comment. The weekly email is the whole Pierce County edition, Tacoma included.

Written by software from public records; every item links to its record. Who publishes it.

Open comment deadlines

The last day the agency takes written comments. Each notice says how to send them.

  1. USG Taylor Way Plant Site cleanup: environmental determination issued

    2301 Taylor Way, Tacoma. Lead agency: WA Department of Ecology. Determination of non-significance. Record SEPA 202604805.

Planning and environmental review

  1. USG Taylor Way Plant Site cleanup: environmental determination issued

    The cleanup addresses arsenic and lead contamination in soil and groundwater across four areas of the site, including excavation, installation of a funnel and gate permeable reactive barrier (PRB), and soil capping. After comments close on December 18, state rules let the lead agency keep, change or withdraw the determination.

    Sources: Washington Department of Ecology, record 202604805; Washington State Legislature, wAC 197-11-340

    Comments on or before

    Record
    SEPA 202604805 from Washington Department of Ecology
    Where
    2301 Taylor Way, Tacoma
    Filed as
    Environmental review (SEPA)
    Status
    Decision Issued (Nov 13, 2026). The agency has published its decision on this application. A land-use or environmental decision is not a building permit.

    The record, documents and related filings for SEPA 202604805

  2. 3-lot unit lot subdivision filed on E C St

    Adapt Building Development LLC applied to divide a 7,100-square-foot parcel into three unit lots: one for the existing single-family residence and one for each of two DADUs.

    Record
    TACOMA LU26-0220 from City of Tacoma
    Where
    E C St, Tacoma
    Filed as
    Land Use - Application
    Status
    Missing Required Documents (Nov 9, 2026). The agency is waiting for something from the applicant, such as documents or fees. Nothing has been approved.
  3. Lot division and boundary line adjustment filed on N 43rd St

    An application was filed to create a new parcel from Lot 15 and simultaneously adjust the boundary line to expand that lot.

    2 filings in this item

    Record
    TACOMA LU26-0221 from City of Tacoma
    Where
    N 43rd St, Tacoma
    Filed as
    Land Use - Application
    Status
    Plan Review in Process (Nov 12, 2026). The agency is reviewing the application. Nothing has been approved.

Commercial

  1. JP Morgan tenant improvement filed at Broadway

    An application was filed for an interior tenant improvement of approximately 4,670 square feet in Suite 1100 of a commercial building. The work includes new offices, workstations, conference and support rooms, a work café, and new fire protection, lighting, security and low-voltage systems, with a valuation of $1,698,500. City of Tacoma records list this application as “Plan Review in Process”: it is in review, and no decision has been made.

    Record
    TACOMA BLDCA26-0359 from City of Tacoma
    Where
    1145 Broadway, Tacoma
    Filed as
    Building - Commercial
    Status
    Plan Review in Process (Nov 10, 2026). The agency is reviewing the application. Nothing has been approved.
  2. Fire alarm notification appliances filed for ASC Suite 340

    Kirby Electric filed a building permit to utilize an existing spare circuit and install 6 strobe-only and 4 horn/strobe notification appliances in Suite 340 at S Cedar St. The valuation is $4,860. That value is for this filing only; the other filing lists $31,500. City of Tacoma records show an earlier filing at this address, in September 2024, for “Renovation of the reception desk to enlarge and provide more reception seats.” City of Tacoma records list this application as “Pending Intake Screening”: it is on file, and a permit comes only after review.

    Sources: City of Tacoma, record FIREC26-0243; City of Tacoma, record BLDCA24-0360

    2 filings in this item

    Record
    TACOMA FIREC26-0243 from City of Tacoma
    Where
    2202 S Cedar St, Tacoma
    Filed as
    Building - Commercial
    Status
    Pending Intake Screening (Nov 13, 2026). The agency has received the application and is checking that it is complete. Nothing has been approved.
  3. Building - Commercial filed at S 72nd St

    Building - Commercial application filed for S 72nd St, Tacoma. Declared valuation $22,000. That value is for this filing only; the other filing lists $5,500.

    2 filings in this item

    Record
    TACOMA FIREC26-0244 from City of Tacoma
    Where
    1901 S 72nd St, Tacoma
    Filed as
    Building - Commercial
    Status
    Pending Intake Screening (Nov 13, 2026). The agency has received the application and is checking that it is complete. Nothing has been approved.
  4. Audio device installation filed for Progress House Association

    An application was filed by Everon LLC to add an audio device in the hallway outside the first-floor restroom at The Progress House Association. The filing is waiting for required documents, with a valuation of $2,203. City of Tacoma records show an earlier filing at this address, in March 2023, for “Replacing the exterior stairs on a commercial building.”

    Sources: City of Tacoma, record FIREC26-0241; City of Tacoma, record BLDCA23-0097

    Record
    TACOMA FIREC26-0241 from City of Tacoma
    Where
    5601 6th Ave, Tacoma
    Filed as
    Building - Commercial
    Status
    Missing Required Documents (Nov 10, 2026). The agency is waiting for something from the applicant, such as documents or fees. Nothing has been approved.
  5. Fire alarm system filed for N Tacoma Ave renovation

    A building commercial permit was filed to install an addressable shell/core fire alarm system in the existing two-story commercial building during renovation. Fire Protection Inc applied; the permit is waiting for a fee payment. City of Tacoma records show an earlier filing at this address, in February 2026, for “Exterior Improvements and Grey Shell upgrades to Commercial Building.” The application lists a value of $5,000. The filing names the project “29 North Tacoma Building”.

    Sources: City of Tacoma, record FIREC26-0242; City of Tacoma, record BLDCA26-0049

    2 filings in this item

    Record
    TACOMA FIREC26-0242 from City of Tacoma
    Where
    29 N Tacoma Ave
    Filed as
    Building - Commercial
    Status
    Permit Fees Due (Nov 13, 2026).

Other larger projects

  1. One of three identical 3-story buildings filed on S M St

    An application was filed by Synthesis9 LLC to construct one of three identical 3-story buildings and related site development at S M St, Tacoma.

    4 filings in this item

    Record
    TACOMA BLDRN26-0381 from City of Tacoma
    Where
    S M St, Tacoma
    Filed as
    Building - Residential
    Status
    Missing Required Documents (Nov 12, 2026). The agency is waiting for something from the applicant, such as documents or fees. Nothing has been approved.
  2. New garage with living space filed on S Highland Ave

    An application was filed to demolish an existing detached garage and construct a new garage with additional living space adjoining the single-family residence. The valuation is $630,000. Applicant: Weddermann Architecture.

    Record
    TACOMA BLDRA26-0895 from City of Tacoma
    Where
    S Highland Ave, Tacoma
    Filed as
    Building - Residential
    Status
    Pending Intake Screening (Nov 13, 2026). The agency has received the application and is checking that it is complete. Nothing has been approved.
  3. Fire-damaged residence repairs filed on E R St

    An application was filed by Woodway Homes, Inc. for repairs to a single-family residence damaged by fire, involving removal and replacement of damaged trusses, gutting to the studs, and new electrical, insulation, appliances, fixtures, coverings and finishes. The valuation is $302,000.

    Record
    TACOMA BLDRA26-0892 from City of Tacoma
    Where
    E R St, Tacoma
    Filed as
    Building - Residential
    Status
    Pending Intake Screening (Nov 12, 2026). The agency has received the application and is checking that it is complete. Nothing has been approved.

New homes

  1. Detached accessory dwelling unit filed at S Prospect St

    An application was filed to build a detached accessory dwelling unit behind the existing single-family dwelling at S Prospect St, Tacoma, including mechanical and plumbing work per approved plans.

    2 filings in this item

    Record
    TACOMA BLDRN26-0380 from City of Tacoma
    Where
    S Prospect St, Tacoma
    Filed as
    Building - Residential
    Status
    Missing Required Documents (Nov 11, 2026). The agency is waiting for something from the applicant, such as documents or fees. Nothing has been approved.

Earlier weeks in Tacoma

  1. American Tower Wireless Tower Relocation: environmental determination issued

    Week of November 2 to 8, 2026. Record SEPA 202604655 from Washington Department of Ecology.

  2. Courthouse commissioner services space remodel filed

    Week of November 2 to 8, 2026. Record TACOMA BLDCA26-0353 from City of Tacoma.

  3. Two-unit detached accessory dwelling unit filed at S Woodlawn St

    Week of November 2 to 8, 2026. Record TACOMA BLDRN26-0375 from City of Tacoma.

  4. Two-story detached accessory dwelling unit at E Grandview Ave

    Week of November 2 to 8, 2026. Record TACOMA BLDRN26-0377 from City of Tacoma.

  5. Riverbend Social alterations filed at Fawcett Ave

    Week of November 2 to 8, 2026. Record TACOMA BLDCA26-0356 from City of Tacoma.

  6. Rebuild four apartment units at S 11th St

    Week of November 2 to 8, 2026. Record TACOMA BLDCA26-0358 from City of Tacoma.

  7. Fire sprinkler system modification filed at Clove Tacoma

    Week of November 2 to 8, 2026. Record TACOMA FIREC26-0238 from City of Tacoma.

  8. New entry in brick wall filed for commercial building

    Week of November 2 to 8, 2026. Record TACOMA BLDCA26-0357 from City of Tacoma.

And 4 more in past issues.